OBJECTIVE: |
Outside Plant Design Engineering |
|
EXPERIENCE: |
8/2014 - 11/2014 |
Atlas Wireless and
Telecommunications LLC |
|
|
Industry: |
|||
|
|
|||
|
Project: T-Mobile Modernization
Rural America South Texas Market § NSN Flexi 2G, 3G and LTE
Commissioning. Integration & Troubleshooting.§ Installation of Flexi ESMB, FSMF, FXFC and FRLB, DC
cable, fiber, RF jumpers, T1, grounding and GPS.§ Voice and data testing, Create closeout package and
equipment delivery. |
|||
|
7/2013 - 11/2013 |
World Link Inc |
||
|
Industry: |
|||
|
|
|||
|
Project: Sprint NV North Central
Region§ Cell Site survey and QA Audit, Prepare, install and
Testing T1 Cables for migration 1.§ Commission and Integration ASR901
Router, Samsung CDMA CIMA and 4G UAMA.§ Perform Fiber Insertion and
T1/Fiber Migration 2 (CDMA cut-over)§ Conduct Site Acceptance Test
Procedures (ATP) for radio equipments, voice and data testing. |
|||
|
3/2013 - 5/2013 |
GW Communications, LLC |
||
|
Industry: |
|||
|
|
|||
|
Project: AT&T South Texas
Market§ Ericsson LTE RBS 6601/DUL, DUW30 - Commission,
Integration and Troubleshooting, Carrier Add. |
|||
|
7/2012 - 1/2013 |
Atlas Wireless and
Telecommunications LLC |
||
|
Industry: |
|||
|
|
|||
|
Project: T-Mobile Modernization
North and South Texas Market § NSN Flexi ESMB, FSME/F, FXFB/C –
Installation, Commission, Integration, and Troubleshooting. Cut-over existing
T1s, Relocate LMU Equipment to new location. §
Perform cell site survey and prepare TSS Report.§ Deliver Equipments and prepare close out package. |
|||
|
12/2009 - 7/2012 |
GW Communications, LLC |
||
|
Industry: |
|||
|
|
|||
|
Project: AT&T, T-Mobile,
Stelera § Nokia Flexi FSME, FRIA, HSPA+ Upgrade - Installation,
Commission & Integration & Troubleshooting. T-Mobile Missouri,
Kansas, Denver and Minnesota Market.§ Nokia IHSPA Upgrade – Nokia
Adapter and GPS Antenna – Installation, Commission & Integration. Stelera
South Texas Market.§ Ericsson RBS 6601, DUW30, 3206,
OBIF, ET-MFX11 - Installation, Commission, Integration and Troubleshooting.
AT&T North & South Texas Market.§ Ericsson 2206/2106 Installation,
Commission, Integration & Troubleshooting. Re-configuration and
Conversion. AT&T Atlanta Market. § New Build Site – Installation of
Nokia Equipments, Ericsson Equipments, Emerson Power Plant, Battery Back-up,
GPS Antenna, T1, RF Jumper Cables and Grounding. AT&T Florida Market.§ T1 Installation from NIU to Ericsson Node B with Emerson
surge protector, Call PCO to perform circuit test, Cut-over existing active
circuits and add new circuit span AT&T Virginia Market. |
|||
|
11/2007 - 11/2009 |
GW Communications, LLC |
||
|
Industry: |
|||
|
|
|||
|
Project: Time Warner Cable North
Texas, Kentucky Data Link, Charter Texas § Perform field survey and
gathering data for aerial and underground routes including pole lines, direct
buried/conduits, hand holes, bore details, railroad crossing, existing facilities,
utility easement, access cabinets and cell site locations.§ Identify splicing point from overall fiber ring provided
by TWC to serve fiber link to Sprint, T-Mobile, and Verizon cell sites for
Wimax rollout project. § Create OSP design for fiber network:
provisioning, splicing, aerial and underground fiber route.§ Design Right of Entry (ROE) for fiber access to the
building to serve cell site locations. § Design and coordinate OSP plans
for standard city government documentation to facilitate right of way and
construction permit approval. |
|||
|
2/2001 - 8/2005 |
Ericsson Telecommunications Inc |
Philippines |
|
|
|
|||
|
Projects: Globe GSM Phase 7, 8 and
9 / DMPI Sun Cellular GSM Phase 4 § Prepare standard installation
engineering design for RBS Equipments, RF Antenna System, Power System, Alarm
system and Microwave Transmission system. § Conduct field investigation
surveys and prepare TSSR for new, change-out, upgrade, co-location sites and
microwave transmission§ Prepare Bill of Quantities for
Equipment and Materials according to RF configurations.§ Engineering support and issued site instructions to
construction for revision change orders encountered during construction.§ Monitor engineering and construction activities to meet
scheduled deadlines§ Conduct Quality Audit and
Acceptance walk through with customers.§ Certifying job completion and
invoices submitted by sub-contractors for billing purposes.§ RBS Family – Installation, Commission, Integration& Troubleshooting.§ Review as-built documents and close out package. |
|||
|
4/1996 - 1/2001 |
Ericsson Telecommunications Inc |
Philippines |
|
|
Industry: |
|||
|
|
|||
|
Projects: DMPI Sun Cellular, PLDT and
SMART LEC Network§ Design fiber optic network;
deploying Remote Subscriber Switch (RSS), Digital/Subscriber Loop Carrier
(DLC/SLC), Fiber to the Curb (FTTC) and Fiber to the Building (FTTB). Primary
and secondary copper network according to OSP engineering standards,
practices, and construction methods.§ Interface with clients regarding
design guidelines to finalize the design criteria. § Perform field surveys for the preparation of the detailed
OSP design including aerial, manhole, conduits, direct buried cable, cabinet,
distribution point, building entrance.§ Estimate materials, engineering
and installation labor cost for budgetary analysis.§ Insures that design and construction will comply with the
provision in the contracts and specifications.§
Coordinate and assist ROW officer about technical issues for right of way
acquisition.§ Conduct pre-construction staking.§ Engineering support to construction and issue site
instructions concerning design revision and change order for problems
encountered during implementation.§ Monitor engineering and
construction activities to meet target deadline.§ Evaluate Redline Drawings for as-built documentation. |
|||
|
4/1994 - 12/1995 |
Philippine Long Distance Telephone
Co. |
Philippines |
|
|
Industry: |
|||
|
|
|||
|
Project: PLDT LEC Zero Backlog § QA OSP designs submitted by different contractors.§ Engineering study of potential subscribers in rural and
urban areas.§ Perform outside plant field
surveys and staking.§ Design OSP facilities for fiber
and copper network including aerial, manhole and conduit, cabinet,
distribution point, building entrance, cut-over/replacement.§ Estimate and issue work orders for outside plant
maintenance and expansion projects.§ Coordinate with PLDT departments,
contractors and private/government officials involved in Zero Backlog
projects.§ Inspect work of contractors according to contract and
specifications.§ Quantity surveys and certifying
invoices from contractors.§ Monitor status of the project.§ As-built documentation. |
|||
|
EDUCATION: |
3/1986 - 3/1991 |
Divine Word University |
|
|
|
|||
|
CERTIFICATION: |
8/2014 |
NOKIA |
NRTU2 |
||
|
Install, Commission and Integrate
Nokia FlexiBTS |
||
|
LANGUAGES: |
Languages |
Proficiency Level |
English |
Advanced |
|
Tagalog |
Fluent |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||